6 Days Lemosho Route
OVERVIEW
THE SHORTEST LEMOSHO ROUTE VARIATION
Below is the day by day itinerary for the six day Lemosho route on Mount Kilimanjaro.
The six day Lemosho route variation is not recommended because it is difficult to cover the distance and elevation in the allotted time.
Specifically, on day 2, the journey from Forest Camp to Shira 2, is rather long and has an elevation gain of 3,000 feet. It would not be unusual for climbers to have symptoms of altitude sickness while only on the second day of the climb due to the quick pace.
Secondly, day four combined with day five makes for a very tough schedule. Day four is a full day of trekking from Barranco to Barafu. Then after dinner and a partial night’s sleep, the very long and strenuous summit day begins around midnight. The 6 day Lemosho route requires 19-24 hours of demanding walking, at extremely high elevation, with only 4-6 hours of sleep.
Climbing Cost Includes
- 2 nights hotel accommodation in Moshi (before & after climb)
- Group transport to and from Moshi to the trail head
- Kilimanjaro National Park permits, camping/hut fees, rescue fees and Value Added Tax (VAT)
- Expert guide, assistant guides, cook and porters
- Bottled oxygen, for emergency rescue only
- Four season, 3 person mountain tents, double occupancy
- Sleeping pad, foam, 1.5 inches thick
- Mess tents, tables, chairs, lanterns
- Fresh, nutritious meals on the mountain
- Breakfast at hotel
Climbing cost excludes
- Airfare
- Beverages at hotel
- Personal gear and equipment
- Tips
Inquire Now
Why book with us?
- Unbeatable support
- World Class Guides
- Expert Advice 24/7
- Specialized Safari Vehicles